What have the contractors been up to?
- well, we dropped by before work this morning to confirm which toilet bowls and sinks go to which bathroom... but they'll work on it tomorrow
- The metal/iron sections of our perimeter fencing have been installed
- Air-cons have been delivered yesterday and installed by this afternoon
- Our stainless steel stairs railings and main door handles had also been delivered today - they're likely to be installed tomorrow
- Perimeter fencing lights have been partially installed
- cabinets for the kids rooms have been completed & delivered, but not installed yet (Henry has his own furniture factory, so we had our closets and cabinets custom built, as with all the doors)
- The water tank and water heater support is also ready - waiting for final coat of paint and the stainless steel tank to be installed
- Ball is in our court though for the driveway and main entrance floor - another long drive to Bandar again to choose the tiles, and hope to have it done by midweek next week
Anyway, enjoy the pics below. Sorry I had to use cameraphone as I left my proper camera at home. Have a good weekend all. Wassalamualaikum.
.jpg)
metal fencing installed. contractor painted the leaves in green when we wanted black/gold - they'd rectify it soon (they say it should be easy)
.jpg)
view from a distance
.jpg)
Air-con in its place
.jpg)
stairs railing - to be installed tomorrow

the perimeter fencing lighting base already installed.
.jpg)
support for water tank and water heater
.jpg)
black clouds when we reached the house @ 5.30.... by 7pm, the heavens opened with heavy torrential rain for a good half hour, and continued with slight drizzle