2 weeks into April - what have they done? See below:
Stairs handrail installed and sanded, prepared for the coatings
This part of the handrail was painstakingly sculptured from a big block of wood!
view from the top of the stairs
Muhammad walking down the stairs clutching his prized Gameboy
Aaeeshah is still recovering from her coughing, but do not want to be left behind
view from inside the family room - the panel on the left is
slidable (if there is such a word)
Iman's built in display cabinet cum bench
Family lounge's bench and hidden storage space
storage space outside the common bathroom outside Muhammad's room
Iman's sink. Now just needing towel rail and mirror.
likewise for the common bath @ Muhammad's bathroom
remember in my past posting that they painted the 'leaves' green? They have now painted in gold/black
we didn't have this in mind when we specified the design, but I love the result.
Wall lights for the front entrance and dining room foyer
Our 'bar' light
In three weeks time, this wall will have a lovely LCD HD TV hehehahahhohoh, can't wait to watch Man Utd beat Liverpool in the Champions League final.... Asri/Paul/Natasha if you are reading this, you are invited!
The driveway tile progressing well despite the sudden heavy downpour at lunch time
Our camera-shy future-pet is angry?? well, she was just yawning and I took the shot at the perfect timing... cats have sixth sense perhaps??
Footsteps... somebody was wearing ESPRIT slippers...
No comments:
Post a Comment