From the outside, it looked as if there was no progress since Sunday but inside, actually there has been a lot done, i.e. ceiling for garage & maid's room and the bedrooms' floors were levelled. I am hoping that in a week or two they will be able to install the wooden flooring. I will update you with more pics by this weekend, InsyaAllah.
Corridor to the Master Suite being levelled - preparation for the wood flooring
same thing, this time showing more of the corridor and entrance to the master suite
No comments:
Post a Comment