Wednesday, 19 March 2008

Updates @ 19 March 08

Updates? They're done now with getting more sand for the lawn - What's left now is to level it.

Ceilings have now been painted with the second coat - so that is done now. The walls will only be painted with second coat once we are ready to move in, as with the door I supposed.

New granites have been delivered (to replace two pieces contaminated with oil drops). Ah Guan had installed them in the dry kitchen (See pic below).

Driveway? Now that no truck is entering the compound, the foreman has prepared the layout of the driveway. Should be ready in less than 2 weeks I supposed - subject to weather of course!

Enjoy the pics then.


the lawn is clear now, rid of the staff toilets

they have prepared the driveway - 'packing' for the next step i.e. dig up the driveway, put in metal thingy and then, concrete.

the craftmanship put in to ensure the edges are very smooth

Another angle of the bench...

Sanding the edges of the ceiling design.

Granite finally installed at the dry kitchen


No comments: